空壓機(Jī)的停(Tíng)用在各個(Gè)單位(Wèi)都常有發(Fā)生。那麼在(Zài)初次開機(Jī)前空壓機(Jī)停放時間(Jiān)超過三個(Gè)月或空壓(Yā)機(Jī)停用時(Shí)間超(Chāo)過三個月,再次(Cì)開機前需(Xū)要采取有效措施,bi須(Xū)先請專業(Yè)空壓(Yā)機(Jī)人(Rén)員對機器(Qì)進行保養檢(Jiǎn)測,制定安全措施(Shī),避免開(Kāi)機後發生不(Bú)良狀況。
The shutdown of air compressors often occurs in various units. Then, before the first start-up, the air compressor parking time is more than three months or the air compressor parking time is more than three months. Before the second start-up, effective measures need to be taken. The Bi must first ask professional air compressor personnel to carry out maintenance and inspection of the machine, and formulate safety measures to avoid adverse conditions after the start-up.
1、先(Xiān)檢查電路(Lù)狀态,是否(Fǒu)正常供電,電壓是否穩定;測量電(Diàn)動機絕(Jué)緣電阻,數值大(Dà)于1MΩ。
1. Check the state of the circuit first, whether the power supply is normal, whether the voltage is stable; Measure the insulation resistance of the motor, the value is greater than 1M.
2、檢查空壓機(Jī)配件上是否(Fǒu)含有積水,灰塵,及時清理。
2. Check whether there is water and dust on the spare parts of air compressor, and clean them up in time.
3、對(Duì)進氣(Qì)口,出(Chū)氣口全面(Miàn)檢(Jiǎn)測,防止發生堵塞現象
3. Overall inspection of intake and outlet to prevent blockage
4、在(Zài)上述都已經完成(Chéng)的情(Qíng)況可以接(Jiē)通電(Diàn)源,查看電腦(Nǎo)控(Kòng)制器是否(Fǒu)正常運行
4. If all the above have been completed, the power supply can be connected to check whether the computer controller is working properly.
5、更換三濾和潤滑油。因為在(Zài)長期不用的(De)情況下,三(Sān)濾,油可能發生(Shēng)老化現象,從而(ér)造成空壓(Yā)機開(Kāi)機運(Yùn)行時間不(Bú)長即結膠積碳(Tàn)或堵塞,油路不(Bú)暢使空壓機(Jī)主機或其他零部件損壞。
5. Replace three filters and lubricants. Because in the case of long-term non-use, three filters may cause oil aging phenomenon, which causes the air compressor start-up time is not long, that is, cementing carbon deposit or blockage, oil circuit is not smooth, so that air compressor main engine or other parts are damaged.
6、專業人員試機,電路改造(Zào)後人工(Gōng)控制(Zhì)加載卸載,先空(Kōng)載運行10分(Fèn)鐘以(Yǐ)上,檢測(Cè)各項指(Zhǐ)标和震動(Dòng)、噪音等正(Zhèng)常,再進行(Háng)加載,查看(Kàn)各(Gè)部件運(Yùn)行正常即(Jí)可。
6. Professional personnel test machine, after circuit modification, manual control loading and unloading, first no-load operation for more than 10 minutes, detection of various indicators and vibration, noise and other normal, then load, check the normal operation of the components.